2 Master Manufacturing 2

Food · Feed · Fine Chemicals · Pharma

ISA-95 models that make your factory data-ready.

Equipment hierarchy and Unified Namespace models for process manufacturers — the foundation for MES, historians, digital twins and continuous improvement.

ISA-95 process model of the fictional Peppernut factory
Example model · NIX Enterprise, Peppernut factory — full PDF

100+

factories modelled end-to-end

25+

years in process manufacturing

ISA-95

standard-aligned models

6σ

Black Belt methodology

Experience gained at

FrieslandCampinaDanone NutriciaCroda / UniqemaVION IngredientsRousselotKD Pharma Group
Marnix Morskate in a plant control room

Your consultant

Hi, I'm Marnix Morskate.

Chemical engineer and Six Sigma Black Belt. For over 25 years I've worked on shop floors, in control rooms and in boardrooms — and modelled more than 100 factories along the way. You work with me directly, from first scan to final model.

More about me →

The problem

Industry 4.0 projects stall when nobody agrees what the factory actually looks like.

Tags without context, historians nobody trusts, ERP and shop floor that don't speak the same language. A clear equipment hierarchy connects ISA-95 Level 1/2 control systems to Level 4 business systems — the two 2's in our name.

How we work

Three steps. Start as small as you like.

01 · 1–2 weeks

Quick Scan

Assess your processes, systems and goals. You get a clear picture of where structure is missing.

02 · 3–6 weeks

Equipment Hierarchy Model

A full ISA-95 process and equipment model of your plant, from raw material intake to shipping — delivered in Visio.

03 · on scope

UNS & Digital Roadmap

Turn the model into a Unified Namespace, historian design and digital twin roadmap your team can build on.

All services in detail →

See it in action

How an ISA-95 model is built

A 2.5-minute walkthrough of a fictitious dairy plant model in Microsoft Visio, using the 2MM2 ISA-95 shape library: areas, work centers, units and material transfers — each with its own data.

Our approach →

No matter how small you start — start with structure.

A free 30-minute intake call to map where your factory stands.

Book an intake call